Responsible declaration of occupancy · El Ejido
Piso del Águila: occupancy paperwork for a 1985 flat to get the electricity connected
Without the occupancy document, the electricity company would not connect the supply.
The brief
A 1985 flat in Santa María del Águila has had no electricity supply for years. The electricity company asks for the occupancy document before it will connect it.
Our proposal
- Visit to check the conditions of the flat.
- Technical certificate and drawings of the flat as it stands.
- Responsible declaration (declaración responsable) of occupancy filed with the town hall.
The numbers
- Floor area
- 88 m²
- Fees
- €450 to €600
- Timescale
- 1 to 2 weeks
- Procedure
- Responsible declaration of occupancy
Fees exclude VAT. Building costs are estimates for a typical case; the real budget depends on your plot, your finishes and the builder.
Other project types
Parcela Guardias Viejas
A bargain near the beach that turned out not to be one: what a pre-purchase report looks at.
€350 to €450Casa Ancha
A ramp, 90 cm doors and a bathroom with room to turn.
€1,600 to €2,200Local Bulevar
An empty ground-floor shop unit turned into a two-bedroom flat.
€1,900 to €2,400Is your case like this one?
Tell us about it on WhatsApp. The first consultation is free.